Ofon Field Development: Challenges of Monitoring a Complex Turbiditic Field

Emmanuel De-Pierrefeu, Daniel Ekpenyong, Nnamdi Amechi, and Renaud Perret-Du-Cray

The Ofon Field was started in 1998 and developed with water injection. It is currently producing from 17 producers and 7 injectors. All the data acquired during the 1998-2004 period and the production behaviour of the field showed an increasing complexity of both the static description and the dynamic behaviour.

A redevelopment of the field is planned for 2009 with 39 new wells and an additional injection capacity for massive pressure support.

This paper summarizes all the monitoring actions that have been done so far on the field. It will review the information provided by these monitoring actions, and then explain the new needs that appeared and how they will be handled.

Pressure monitoring:

The combination of the two sets of pressure data is the main tool for optimising injection allocation.

Test data for GOR and water monitoring: